SolaX Power Network Technology (Zhejiang) Co.,Ltd.
SolaX Power Network Technology (Zhejiang) Co.,Ltd.
ENGLISH(GLOBAL)

The average payback period for a 1 MW solar power plant is around 3 years with local subsidies, and about 5 years without subsidies. However, the actual payback time depends on various factors, such as local regulations, power consumption, and on-grid tariff policies.

SolaX C&I PV inverters + DataHub 1000 = Zero Feed-in Control

SolaX C&I PV inverters + DataHub 1000 = Zero Feed-in Control

All the inverter data can be monitored on SolaX Cloud platform

SolaX C&I PV inverters + DataHub 1000 = Zero Feed-in Control

These plants can be built on building rooftops or open spaces to form self-contained power plants and generate profits by selling excess electricity to the grid.

SolaX C&I PV inverters + DataHub 1000 = Zero Feed-in Control
SolaX C&I PV inverters + DataHub 1000 = Zero Feed-in Control

With all C&I inverters connected to the 3 available RS485 ports on DataHub1000, the output power and export power of the whole power plant can be set and controlled in accordance to the site requirements.

Commercial & Industry

Support up to 60 units of on-grid inverters

Commercial & Industry

Support up to 60 units of on-grid inverters

Compatible String Inverters

Device

Each port can communicate 

with up to 20 inverters in 

cascading daisy chain.

Commercial
Up to 60 inverters per DataHub.

Interact with smart meters such as the DTSU666-CT from SolaX.

Industry
SolaX Power Network Technology (Zhejiang) Co.,Ltd.
We use cookies to optimise and personalise your experience, but you can choose to opt out of non-essential cookies.
To find out more, read our Privacy Policy and Terms of Use
Reject All
Accept All